- LOCATION EVALUATION
- Geographical Criteria
- Identification of Hazards
- DATA CENTER RELIABILITY
- Uptime Record
- Service Level Agreement (“SLA”)
- Flexibility / Expansion / Renewals
- System Redundancies
- DATA CENTER ECONOMICS
- PUE and Method of Measurement
- Server Ready, Hot Shell or Colocation Space
- Comparative Budgets
- Comparative Cost / kW Analysis
- Size / Density / Redundancy Analysis
- Lease vs. Own Model
- Governmental and Tax Incentives
|
- POWER AND UTILITIES
- Power Density Requirements
- Electric Power Availability and Cost
- Alternative Energy Availability and Cost
- Power Cost Comparisons
- Power Delivery
- Water Availability and Cost
- CONNECTIVITY
- Communication / Fiber Availability and Cost
- Number of Providers
- Easements – Availability, Timing and Cost
- ENVIRONMENTAL CONSIDERATIONS
- Carbon Footprint
- “Green” Site Attributes
- LEED Certification
- SITE EVALUATION
- Site Restrictions / Issues
- Access and Transportation
- Parking
|
- BUILDING AND STRUCTURE
- Existing, Refit or Build-to-Suit
- Exterior, Roof and Floor Integrity
- Equipment Yard Dimensions and Proximity
- Loading / Truck Access
- Local Code and Permits
- INTERIOR EVALUATION
- Building “Fit” for Module / Data Hall Size
- Column Spacing, Clear Height, Depths and Other Specs
- TIMING
- Critical Path Timing
- Equipment Lead Times
- Commissioning
- SYSTEM INSPECTIONS
- Base Building MEP
- Specialized Data Center Systems
- SECURITY
- Site Characteristics
- Building Security Systems

|